W3vina.COM Free Wordpress Themes Joomla Templates Best Wordpress Themes Premium Wordpress Themes Top Best Wordpress Themes 2012

Revision 9538 is a pre-publication revision. (Viewing current revision instead.)

work flow for asset management

ONE TIME STEPS TO DO: STEP 1: To Create the Activity Type  in Masters Path: Maintenance>Masters>Activity Type    For e.g.,
  • Enter Code as PM
  • Enter Preventive Maintenance
  • Enter  remarks for any explanation if required
  • Click save
Click here Activity Type STEP 2: To create  the list of Activities  ( under each Activity Type) in the Masters  Path: Maintenance>Masters >Activity  
  • Create a relevant code as e.g., MM
  • Enter the Name as e.g., Monthly maintenance
  • Select the Activity type as Preventive maintenance
  • Click save/update
Click here Activity STEP 3: To create an Asset Type in Masters Path: Maintenance>Masters>Asset type  
  • Select the Code category as Asset Type
  • Create a relevant code for an asset type e.g., AS000025AS
  • Enter  the Name  for the asset type e.g., POWER TRANSFORMERS
  • Select the Tracking type
  • Select the Nature
  • Select the Asset schedule
  • Select the tab –Activity
  • Enter the fields
  • Use Add row to enter more than one activity
Click here Asset Type STEP4. To create the list of  Assets (under each Asset Type) in Masters  Maintanence> Masters> Asset
  • Select Asset Type from the picklist e.g., POWER TRANSFORMER
  • Create a relevant  Asset Code 
  • Enter the Asset Name
  • Enter the batch serial
4(A): Select the tab - classification and fill all the details 4(B): Select the tab - parameter and fill all the details 4(C): Select the tab - FMS
  • Select Party type as Own asset
  • Select the Running status as Running
  • Select energy metering as Not required
  • Click update
Click here Asset STEP 5: To  create the  list of Parameters in the Masters Path: Maintenance>Masters>Parameter
  • Create a relevant code
  • Enter the name of the parameter 
  • Enter all the fields
  • Click save
Click here Parameter Step 6: To set the Parameters for a particular Asset Type  Path: Maintenance >Masters>Parameter Set  
  • Select the Code & Name of the Asset Type (already created by you) for e.g., Breaker
  • Select the parameters to set ( already created by you)
  • Use Add Row to set more than one parameter
  • Click save/update
Click here Parameter Set STEP 7: To  schedule the activities to be done  for each Asset Maintenance >Masters>Asset Activity  
  • Select Type as Asset
  • Select  the Asset Type, Asset & the Activity from the pick list (already created by you )   
  •  Select the Assigned to as e.g., User 
  • Select the user from the picklist ( already created by your admin)
  • Select the Parameter set from the picklist (already created by you)
  • Set the Scheduler by selecting  from one of the various options 
  • Click save/update
Click here Asset Activity  STEP 8: To create the Party with Branch Click Accounts>Master>Ledger>Party with Branch
  • Create the codecategory as Party
  • Create the code for the Party (Auto Generated)
  • Enter the Name, Shortname, currency of the Party
  • Select account 
  • Select the Account Group
  • Select the tab – Party branch and enter all the fields.
  • Click save/update 
STEPS TO DO ON A REGULAR BASIS: STEP 1: To Create Task  Path: Maintenance>Transactions>Task Generation   
  • Select Asset Type
  • Select the Asset
  • Select the Party Branch
  • Select the Activity
  • Enter the Task date
  • Click Generate
Click here Task Generation STEP 2: To schedule a Task Path: Maintenance>Transactions>Task  
  •  Click the Plus sign to add a new task 
  • Task Number is Auto-generated
  • Select the Name of the Task
  • Select the Nature as Asset
  • Select the type as Task
  • Select the Activity, In-charge, Assigned-to
  • Enter all the fields in Plan.
Click here

Contents

WORKFLOW FOR CALL REGISTRATION: STEP1: To register the calls which come for small functional Problems    Maintenance >Masters>Call Registration  
  • Select the Number(Auto Generated)
  • Select the Type as Call Registration
  • Enter the Date
  • Enter the problem
  • Select all the fields under call From &callTo
  • Select Type of call as Indoor
  • Select call status as working
  • Select the Call details tab and Enter all the fields.
  • Click save/update 
Click here Call Registration Step 2: To schedule and assign the calls and tasks
  • Maintenance>Transaction>Workbench
  • Select Type as Call 
  • Click save/update
 Path to view the various reports: !. Maintenance >Reports>Call >Call registration > Pending calls>Filter options >settings >PDF 2.Maintenance>Reports>Call>Call registration > Naturewise call summary   Video Links: Asset & Activity creation Watch Video  Click here  How to register a call Watch Video Click here                        

Revision Differences

July 24, 2018 @ 19:10:27Current Revision
Title
Deleted: work flow for asset managementAdded: WORK FLOW FOR FACILITY MAINTENANCE
Content
Deleted: <strong>WORK FLOW FOR ASSET MANAGEMENT</strong> 
Deleted: <strong> </strong> 
Unchanged: <strong>ONE TIME STEPS TO DO:</strong>Unchanged: <strong>ONE TIME STEPS TO DO:</strong>
Deleted: <strong> </strong> 
 Added: <a href="http:// help.goodbookserp.com/wp- content/uploads/ 2018/07/WORK- FLOW-MASTERS-1.png"><img class="alignnone wp-image-9614 size-full" src="http://help.goodbookserp.com/ wp-content/uploads/2018/07/ WORK-FLOW-MASTERS-1.png" alt="" width="693" height="169" /></a>
Deleted: <strong>STEP1 .To Create the Activity Type (Group) in Masters</strong> Added: <strong>STEP 1: To Create the Activity Type  in Masters</strong>
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
 Added: <strong>Path: Maintenance&gt; Masters&gt;Activity Type </strong>
 Added: <strong> <a href="http:// help.goodbookserp.com/wp- content/uploads/ 2018/07/ACTIVITY- TYPE.png"><img class="alignnone wp-image-9541 size-full" src="http://help.goodbookserp.com/ wp-content/uploads/2018/07/ ACTIVITY-TYPE.png" alt="" width="619" height="297" /></a></strong>
 Added: For e.g.,
Unchanged: <ul>Unchanged: <ul>
Deleted: <li><strong>Enter Code as PM</strong></li> 
 Added: <li>Enter Code as PM</li>
Deleted: <li><strong>Enter Preventive Maintanence</ strong></li> Added: <li>Enter Preventive Maintenance</li>
 Added: <li>Enter  remarks for any explanation if required</li>
Deleted: <li><strong>Click save/update</ strong></li> Added: <li><strong>Click save</strong></li>
Unchanged: </ul>Unchanged: </ul>
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong>STEP2. To create an Activity in the Masters</strong> 
Deleted: <strong> </strong> 
 Added: Click here <a href="http:// help.goodbookserp.com/?p=14474" target="_blank" rel="noopener">Activity Type</a>
 Added: <strong>STEP 2: To create  the list of Activities  ( under each Activity Type) in the Masters</strong>
Deleted: <strong>Click Maintenance&gt;Masters &gt;Activity</strong> Added: <strong> Path: Maintenance&gt;Masters &gt;Activity</strong>
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
 Added: <a href="http:// help.goodbookserp.com/wp- content/uploads/ 2018/07/ACTIVITY.png"><img class="alignnone wp-image-9542 size-full" src="http://help.goodbookserp.com/ wp-content/uploads/2018/07/ ACTIVITY.png" alt="" width="651" height="419" /></a>
 Added: &nbsp;
Unchanged: <ul>Unchanged: <ul>
Deleted: <li><strong>Enter the code as MM</strong></li> 
 Added: <li><strong>Create a relevant code as e.g., MM</strong></li>
Deleted: <li><strong>Enter the Name as Monthly maintenance</ strong></li> Added: <li><strong>Enter the Name as e.g., Monthly maintenance</ strong></li>
Unchanged: <li><strong>Select the Activity type as Preventive maintenance</ strong></li>Unchanged: <li><strong>Select the Activity type as Preventive maintenance</ strong></li>
Unchanged: <li><strong>Click save/update</ strong></li>Unchanged: <li><strong>Click save/update</ strong></li>
Unchanged: </ul>Unchanged: </ul>
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
 Added: Click here <a href="http:// help.goodbookserp.com/?p=9948" target="_blank" rel="noopener" >Activity</a>
Deleted: <strong>STEP3. .To create an Asset Type (Group for assets) in Masters</strong> Added: <strong>STEP 3: To create an Asset Type in Masters</strong>
Deleted: <strong> </strong> 
Deleted: <strong>Click Maintenance&gt; Masters&gt;Asset type</strong> Added: <strong>Path: Maintenance&gt; Masters&gt;Asset type</strong>
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
 Added: <strong> <a href="http:// help.goodbookserp.com/wp- content/uploads/ 2018/07/ASSET- TYPE.png"><img class="alignnone wp-image-9546 size-full" src="http://help.goodbookserp.com/ wp-content/uploads/2018/07/ ASSET-TYPE.png" alt="" width="849" height="573" /></a></strong>
Unchanged: <ul>Unchanged: <ul>
Deleted: <li><strong>Create the Code category as Asset Type</strong></li> Added: <li><strong>Select the Code category as Asset Type</strong></li>
Deleted: <li><strong>Create the code (for asset type)</strong></li> 
Deleted: <li><strong>Create the Name ( for asset type)</strong></li> 
 Added: <li><strong>Create a relevant code for an asset type e.g., AS000025AS</strong></li>
 Added: <li><strong>Enter  the Name  for the asset type e.g., POWER TRANSFORMERS< /strong></li>
Unchanged: <li><strong>Select the Tracking type</strong></li>Unchanged: <li><strong>Select the Tracking type</strong></li>
Unchanged: <li><strong>Select the Nature</strong></li>Unchanged: <li><strong>Select the Nature</strong></li>
Unchanged: <li><strong>Select the Asset schedule</strong></li>Unchanged: <li><strong>Select the Asset schedule</strong></li>
Unchanged: <li><strong>Select the tab –Activity</ strong></li>Unchanged: <li><strong>Select the tab –Activity</ strong></li>
Unchanged: <li><strong>Enter the fields</strong></li>Unchanged: <li><strong>Enter the fields</strong></li>
 Added: <li><b>Use Add row to enter more than one activity</b></li>
Unchanged: </ul>Unchanged: </ul>
Deleted: <strong> </strong> 
 Added: Click here <a href="http:// help.goodbookserp.com/?p=8703" target="_blank" rel="noopener">Asset Type</a>
 Added: <strong>STEP4. To create the list of  Assets (under each Asset Type) in Masters</strong>
Deleted: <strong>To perform more than one activity</strong> Added: <strong> Maintanence&gt; Masters&gt; Asset</strong>
 Added: <a href="http:// help.goodbookserp.com/wp- content/uploads/ 2018/07/ASSET.png"><img class="alignnone wp-image-9547 size-full" src="http://help.goodbookserp.com/ wp-content/uploads/ 2018/07/ASSET.png" alt="" width="937" height="521" /></a>
Unchanged: <ul>Unchanged: <ul>
Deleted: <li><strong>Click add row and enter the field</strong></li> 
Deleted: </ul> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong>STEP4. To create an  Asset in the Masters</strong> 
Deleted: <strong>Click Maintanence&gt; Masters&gt; Asset</strong> 
Deleted: <strong> </strong> 
Deleted: &nbsp; 
Deleted: &nbsp; 
Deleted: <ul> 
Deleted: <li><strong>Select Asset Type </strong></li> 
Deleted: <li><strong>Enter Asset Code</strong></li> 
 Added: <li><strong>Select Asset Type from the picklist e.g., POWER TRANSFORMER</ strong></li>
 Added: <li><strong>Create a relevant  Asset Code </strong></li>
Deleted: <li><strong>Enter Asset Name</strong></li> Added: <li><strong>Enter the Asset Name</strong></li>
Unchanged: <li><strong>Enter the batch serial</strong></li>Unchanged: <li><strong>Enter the batch serial</strong></li>
Deleted: <li><strong>Select the tab - classification and fill all the details</strong></li> 
Deleted: <li><strong>Select the tab - parameter and fill all the details</strong></li> 
Unchanged: </ul>Unchanged: </ul>
Deleted: <strong> </strong> 
Deleted: &nbsp; 
Deleted: &nbsp; 
Deleted: &nbsp; 
Deleted: &nbsp; 
Deleted: <strong> </strong> 
Deleted: <ul> 
 Added: 4(A): <strong>Select the tab - classification and fill all the details</strong>
 Added: 4(B): <strong>Select the tab - parameter and fill all the details</strong>
 Added: <a href="http:// help.goodbookserp.com/wp- content/uploads/ 2018/07/ASSET- PARAMETER.png"><img class="alignnone wp-image-9544 size-full" src="http://help.goodbookserp.com/ wp-content/uploads/2018/07/ ASSET-PARAMETER.png" alt="" width="1317" height="579" /></a>
Deleted: <li><strong>Select the tab FMS </strong></li> Added: <strong>4(C): Select the tab - FMS </strong>
Deleted: </ul> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
 Added: <strong><a href="http:// help.goodbookserp.com/wp- content/uploads/ 2018/07/FMS.png"><img class="alignnone wp-image-9549 size-large" src="http://help.goodbookserp.com/ wp-content/uploads/2018/07/ FMS-1024x512.png" alt="" width="1024" height="512" /></a></strong>
Unchanged: <ul>Unchanged: <ul>
Unchanged: <li><strong>Select Party type as Own asset</strong></li>Unchanged: <li><strong>Select Party type as Own asset</strong></li>
Deleted: <li><strong>Select Running status as Running</strong></li> Added: <li><strong>Select the Running status as Running</strong></li>
Unchanged: <li><strong>Select energy metering as Not required</strong></li>Unchanged: <li><strong>Select energy metering as Not required</strong></li>
Unchanged: <li><strong>Click update</strong></li>Unchanged: <li><strong>Click update</strong></li>
Unchanged: </ul>Unchanged: </ul>
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong>STEP5.To Select Asset &amp; activity</strong> 
Deleted: <ul> 
Deleted: <li><strong>Click Masters&gt;Asset Activity</strong></li> 
Deleted: <li><strong>Select Type as asset</strong></li> 
Deleted: <li><strong>Select Asset Type</strong></li> 
Deleted: <li><strong>Select Asset</strong></li> 
Deleted: <li><strong>Select Activity </strong></li> 
Deleted: <li><strong>Select the Assigned to</strong></li> 
Deleted: <li><strong>Select the Parameter set</strong></li> 
Deleted: <li><strong>Select the tab – Select Month under Scheduler</strong></li> 
Deleted: <li><strong>Click update</strong></li> 
Deleted: </ul> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
 Added: Click here <a href="http:// help.goodbookserp.com/?p=14517" target="_blank" rel="noopener">Asset</a>
Deleted: <strong>STEP5. To  create  list of Parameters in the Masters</strong> Added: <strong>STEP 5: To  create the  list of Parameters in the Masters</strong>
Deleted: <strong>Click Masters&gt;Parameter</strong> Added: <strong>Path: Maintenance&gt; Masters&gt;Parameter</strong>
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
 Added: <a href="http:// help.goodbookserp.com/wp- content/uploads/ 2018/07/PARAMETER.png"><img class="alignnone wp-image-9551 size-full" src="http://help.goodbookserp.com/ wp-content/uploads/2018/07/ PARAMETER.png" alt="" width="689" height="581" /></a>
Unchanged: <ul>Unchanged: <ul>
Deleted: <li><strong>Create a code</strong></li> Added: <li><strong>Create a relevant code</strong></li>
Deleted: <li><strong>Enter the name of parameter</strong></li> Added: <li><strong>Enter the name of the parameter </ strong></li>
Unchanged: <li><strong>Enter all the fields</strong></li>Unchanged: <li><strong>Enter all the fields</strong></li>
Unchanged: <li><strong>Click save</strong></li>Unchanged: <li><strong>Click save</strong></li>
Unchanged: </ul>Unchanged: </ul>
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
 Added: Click here <a href="http:// help.goodbookserp.com/?p=14498" target="_blank" rel="noopener" >Parameter</a>
Deleted: <strong>Step6.To set the Parameters for an Asset</strong> Added: <strong>Step 6: To set the Parameters for a particular Asset Type </strong>
Deleted: <strong>Click Masters&gt;ParameterSet</strong> Added: <strong>Path: Maintenance &gt;Masters&gt;Parameter Set</strong>
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
 Added: <strong> <a href="http:// help.goodbookserp.com/wp- content/uploads/ 2018/07/PARAMETER- SET-1.png"><img class="alignnone wp-image-9564 size-full" src="http://help.goodbookserp.com/ wp-content/uploads/2018/07/ PARAMETER-SET-1.png" alt="" width="667" height="577" /></a></strong>
Unchanged: <ul>Unchanged: <ul>
Deleted: <li><strong>Select the Code(of Asset)</strong></li> 
Deleted: <li><strong>Select the Name (of Asset)</strong></li> 
Deleted: <li><strong>Enter the remarks</strong></li> 
 Added: <li><strong>Select the Code &amp; Name of the Asset Type (already created by you) for e.g., Breaker</strong></li>
 Added: <li><strong>Select the parameters to set ( already created by you)</strong></li>
Deleted: <li><strong>Select the parameters to set</strong></li> Added: <li><strong>Use Add Row to set more than one parameter</strong></li>
Deleted: <li><strong>For more entries add click Add Row</strong></li> 
Deleted: <li><strong>Click update</strong></li> Added: <li><strong>Click save/update</ strong></li>
Unchanged: </ul>Unchanged: </ul>
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
 Added: Click here <a href="http:// help.goodbookserp.com/?p=14509" target="_blank" rel="noopener">Parameter Set</a>
 Added: <strong>STEP 7: To  schedule the activities to be done  for each Asset</strong>
 Added: <strong>Maintenance &gt;Masters&gt;Asset Activity</strong>
 Added: &nbsp;
 Added: <a href="http:// help.goodbookserp.com/wp- content/uploads/ 2018/07/ASSET- ACTIVITY.png"><img class="alignnone wp-image-9545 size-large" src="http://help.goodbookserp.com/ wp-content/uploads/2018/07/ ASSET-ACTIVITY- 1024x456.png" alt="" width="1024" height="456" /></a>
 Added: <ul>
 Added: <li><strong>Select Type as Asset</strong></li>
 Added: <li><strong>Select  the Asset Type, Asset &amp; the Activity from the pick list (already created by you</strong>< strong> )    </strong></li>
 Added: <li><strong> < /strong><strong>Select the Assigned to as e.g., User </strong></li>
 Added: <li><strong>Select the user from the picklist ( already created by your admin)</strong></li>
 Added: <li><strong>Select the Parameter set from the picklist (already created by you)</strong></li>
 Added: <li><strong>Set the Scheduler by selecting  from one of the various options </strong></li>
 Added: <li><strong>Click save/update</ strong></li>
Deleted: <strong> </strong>Added: </ul>
 Added: Click here <a href="http:// help.goodbookserp.com/?p=10000" target="_blank" rel="noopener">Asset Activity</a>
Deleted: <strong>STEP7: To create the Party with Branch</strong> Added: <strong> </strong> <strong>STEP 8: To create the Party with Branch</strong>
Deleted: <strong> </strong> 
Unchanged: <strong>Click Accounts&gt;Master&gt; Ledger&gt;Party with Branch</strong>Unchanged: <strong>Click Accounts&gt;Master&gt; Ledger&gt;Party with Branch</strong>
Deleted: <strong> </strong>Added: <strong> <a href="http:// help.goodbookserp.com/wp- content/uploads/ 2018/07/PARTY- WITH-BRANCH.png"><img class="alignnone wp-image-9566 size-full" src="http://help.goodbookserp.com/ wp-content/uploads/2018/07/ PARTY-WITH-BRANCH.png" alt="" width="1255" height="571" /></a></strong>
Deleted: <strong> </strong> 
Unchanged: <ul>Unchanged: <ul>
Unchanged: <li><strong>Create the codecategory as Party</strong></li>Unchanged: <li><strong>Create the codecategory as Party</strong></li>
Deleted: <li><strong>Create the Control Account</strong></li> 
Unchanged: <li><strong>Create the code for the Party (Auto Generated)</strong></li>Unchanged: <li><strong>Create the code for the Party (Auto Generated)</strong></li>
Unchanged: <li><strong>Enter the Name, Shortname, currency of the Party</strong></li>Unchanged: <li><strong>Enter the Name, Shortname, currency of the Party</strong></li>
Deleted: <li><strong>Select account</strong></li> Added: <li><strong>Select account </strong></li>
Unchanged: <li><strong>Select the Account Group </strong></li>Unchanged: <li><strong>Select the Account Group </strong></li>
Unchanged: <li><strong>Select the tab – Party branch and enter all the fields.</strong></li>Unchanged: <li><strong>Select the tab – Party branch and enter all the fields.</strong></li>
Deleted: <li><strong>Click update</strong></li> Added: <li><strong>Click save/update</ strong><strong>  </strong></li>
Unchanged: </ul>Unchanged: </ul>
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Unchanged: <strong>STEPS TO DO ON A REGULAR BASIS:</strong>Unchanged: <strong>STEPS TO DO ON A REGULAR BASIS:</strong>
Deleted: <strong> </strong> 
 Added: <a href="http:// help.goodbookserp.com/wp- content/uploads/ 2018/07/WORK- FLOW-TRANSACTIONSpng-1.png"><img class="alignnone wp-image-9615 size-full" src="http://help.goodbookserp.com/ wp-content/uploads/2018/07/ WORK-FLOW-TRANSACTIONSpng-1.png" alt="" width="681" height="143" /></a>
Deleted: <strong>STEP1: To Create Task</strong> Added: <strong>STEP 1: To Create Task</strong>
Deleted: <strong> </strong> 
Deleted: <strong>Click Maintenance&gt; Transactions&gt;Task Generation</strong> Added: <strong> Path: Maintenance&gt; Transactions&gt;Task Generation</strong>
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
 Added: <strong> <a href="http:// help.goodbookserp.com/wp- content/uploads/ 2018/07/TASK- GENERATION.png"><img class="alignnone wp-image-9552 size-full" src="http://help.goodbookserp.com/ wp-content/uploads/2018/07/ TASK-GENERATION.png" alt="" width="551" height="385" /></a> </strong>
Unchanged: <ul>Unchanged: <ul>
Unchanged: <li><strong>Select Asset Type</strong></li>Unchanged: <li><strong>Select Asset Type</strong></li>
Unchanged: <li><strong>Select the Asset</strong></li>Unchanged: <li><strong>Select the Asset</strong></li>
Unchanged: <li><strong>Select the Party Branch</strong></li>Unchanged: <li><strong>Select the Party Branch</strong></li>
Unchanged: <li><strong>Select the Activity</strong></li>Unchanged: <li><strong>Select the Activity</strong></li>
Unchanged: <li><strong>Enter the Task date</strong></li>Unchanged: <li><strong>Enter the Task date</strong></li>
Deleted: <li><strong>Generate< /strong></li> Added: <li><strong>Click Generate</strong></li>
Unchanged: </ul>Unchanged: </ul>
Deleted: <strong> </strong> 
 Added: Click here <a href="http:// help.goodbookserp.com/?p=14574" target="_blank" rel="noopener">Task Generation</a>
Deleted: <strong>STEP2: To schedule a Task</strong> Added: <strong>STEP 2: To schedule a Task</strong>
Deleted: <strong>ClickMaintenance&gt; Transactions&gt; Task</strong> Added: <strong>Path: Maintenance&gt; Transactions&gt; Task</strong>
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
 Added: <strong> <a href="http:// help.goodbookserp.com/wp- content/uploads/ 2018/07/TASK-1.png"><img class="alignnone wp-image-9568 size-full" src="http://help.goodbookserp.com/ wp-content/uploads/ 2018/07/TASK-1.png" alt="" width="969" height="397" /></a></strong>
Unchanged: <ul>Unchanged: <ul>
 Added: <li><strong> Click the Plus sign to add a new task </strong></li>
Deleted: <li><strong>Task Number is Auto generated</strong></li> Added: <li><strong>Task Number is Auto-generated< /strong></li>
Unchanged: <li><strong>Select the Name of the Task</strong></li>Unchanged: <li><strong>Select the Name of the Task</strong></li>
Unchanged: <li><strong>Select the Nature as Asset</strong></li>Unchanged: <li><strong>Select the Nature as Asset</strong></li>
Unchanged: <li><strong>Select the type as Task</strong></li>Unchanged: <li><strong>Select the type as Task</strong></li>
Unchanged: <li><strong>Select the Activity, In-charge, Assigned-to</ strong></li>Unchanged: <li><strong>Select the Activity, In-charge, Assigned-to</ strong></li>
Unchanged: <li><strong>Enter all the fields in Plan.</strong></li>Unchanged: <li><strong>Enter all the fields in Plan.</strong></li>
Unchanged: </ul>Unchanged: </ul>
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
 Added: Click here
 Added: <h4 class="title style-scope ytd-video-primary- info-renderer"></h4>
Deleted: <strong>WORK FLOW FOR CALL REGISTRATION:</strong> Added: <strong>WORKFLOW FOR CALL REGISTRATION:</strong>
Deleted: <strong>STEP1: To register the calls which comes for small functional Problems </strong> Added: <strong>STEP1: To register the calls which come for small functional Problems </strong>
Deleted: <strong>   Click CRM&gt;Masters&gt;Call Registration</strong> Added: <strong>   Maintenance &gt;Masters&gt;Call Registration</strong>
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
 Added: <strong> <a href="http:// help.goodbookserp.com/wp- content/uploads/ 2018/07/CALL- REGISTRATION.png"><img class="alignnone wp-image-9548 size-full" src="http://help.goodbookserp.com/ wp-content/uploads/2018/07/ CALL-REGISTRATION.png" alt="" width="1465" height="678" /></a></strong>
Unchanged: <ul>Unchanged: <ul>
Unchanged: <li><strong>Select the Number(Auto Generated)</strong></li>Unchanged: <li><strong>Select the Number(Auto Generated)</strong></li>
Unchanged: <li><strong>Select the Type as Call Registration< /strong></li>Unchanged: <li><strong>Select the Type as Call Registration< /strong></li>
Unchanged: <li><strong>Enter the Date</strong></li>Unchanged: <li><strong>Enter the Date</strong></li>
Unchanged: <li><strong>Enter the problem</strong></li>Unchanged: <li><strong>Enter the problem</strong></li>
Deleted: <li><strong>Select all the fields underCall From &amp;callTo</ strong></li> Added: <li><strong>Select all the fields under call From &amp;callTo</ strong></li>
Unchanged: <li><strong>Select Type of call as Indoor</strong></li>Unchanged: <li><strong>Select Type of call as Indoor</strong></li>
Unchanged: <li><strong>Select call status as working</strong></li>Unchanged: <li><strong>Select call status as working</strong></li>
Unchanged: <li><strong>Select the Call details tab and Enter all the fields.</strong></li>Unchanged: <li><strong>Select the Call details tab and Enter all the fields.</strong></li>
Deleted: <li><strong>Click update</strong></li> Added: <li><strong>Click save/update</ strong><strong>  </strong></li>
Unchanged: </ul>Unchanged: </ul>
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong>STEP2:To register calls which comes for Breakdown</strong> 
Deleted: <strong> </strong> 
Deleted: <strong>Click Maintenance&gt; Breakdown&gt; Transaction</strong> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <ul> 
Deleted: <li><strong>Select the Number(Auto Generated)</strong></li> 
Deleted: <li><strong>Select the Type as Call Registration< /strong></li> 
Deleted: <li><strong>Enter the Date</strong></li> 
Deleted: <li><strong>Enter the problem</strong></li> 
Deleted: <li><strong>Select all the fields under Call From &amp;callTo</ strong></li> 
Deleted: <li><strong>Select Type of call as Outdoor</strong></li> 
Deleted: <li><strong>Select call status as stop</strong></li> 
Deleted: <li><strong>Select the Call details tab and Enter all the fields.</strong></li> 
Deleted: <li><strong>Click update</strong></li> 
Deleted: </ul> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong>CALLS &amp; TASK MANAGEMENT:</strong> 
Deleted: <strong> </strong> 
 Added: Click here <a href="http:// help.goodbookserp.com/ ?p=14583">Call Registration</a>
Deleted: <strong>To schedule and assign the calls and tasks</strong> Added: <strong>Step 2: To schedule and assign the calls and tasks</strong>
Deleted: <strong> </strong> 
Unchanged: <ul>Unchanged: <ul>
Unchanged: <li><strong>Maintenance&gt; Transaction&gt;Workbench< /strong></li>Unchanged: <li><strong>Maintenance&gt; Transaction&gt;Workbench< /strong></li>
Deleted: <li><strong>CRM&gt; Transaction&gt;Workbench< /strong></li> 
Unchanged: </ul>Unchanged: </ul>
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong>WORK FLOW FOR ASSET MANAGEMENT</strong> 
Deleted: <strong> </strong> 
Deleted: <strong>ONE TIME STEPS TO DO:</strong> 
Deleted: <strong> </strong> 
Deleted: <strong>STEP1 .To Create the Activity Type (Group) in Masters</strong>Added: <a href="http:// help.goodbookserp.com/wp- content/uploads/ 2018/07/WORK- BENCH.png"><img class="alignnone wp-image-9555 size-full" src="http://help.goodbookserp.com/ wp-content/uploads/2018/07/ WORK-BENCH.png" alt="" width="717" height="321" /></a>
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Unchanged: <ul>Unchanged: <ul>
Deleted: <li><strong>Enter Code as PM</strong></li> 
Deleted: <li><strong>Enter Preventive Maintanence</ strong></li> 
Deleted: <li><strong>Click save/update</ strong></li> Added: <li><strong>Select Type as Call </strong></li>
Unchanged: </ul>Unchanged: </ul>
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong>STEP2. To create an Activity in the Masters</strong>Added: <a href="http:// help.goodbookserp.com/wp- content/uploads/ 2018/07/WBpng.png"><img class="alignnone wp-image-9554 size-full" src="http://help.goodbookserp.com/ wp-content/uploads/ 2018/07/WBpng.png" alt="" width="705" height="463" /></a>
Deleted: <strong> </strong> 
Deleted: <strong>Click Maintenance&gt;Masters &gt;Activity</strong> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Unchanged: <ul>Unchanged: <ul>
Deleted: <li><strong>Enter the code as MM</strong></li> 
Deleted: <li><strong>Enter the Name as Monthly maintenance</ strong></li> 
Deleted: <li><strong>Select the Activity type as Preventive maintenance</ strong></li> 
Unchanged: <li><strong>Click save/update</ strong></li>Unchanged: <li><strong>Click save/update</ strong></li>
Unchanged: </ul>Unchanged: </ul>
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong>STEP3. .To create an Asset Type (Group for assets) in Masters</strong> 
Deleted: <strong> </strong> 
Deleted: <strong>Click Maintenance&gt; Masters&gt;Asset type</strong> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <ul> 
Deleted: <li><strong>Create the Code category as Asset Type</strong></li> 
Deleted: <li><strong>Create the code (for asset type)</strong></li> 
Deleted: <li><strong>Create the Name ( for asset type)</strong></li> 
Deleted: <li><strong>Select the Tracking type</strong></li> 
Deleted: <li><strong>Select the Nature</strong></li> 
Deleted: <li><strong>Select the Asset schedule</strong></li> 
Deleted: <li><strong>Select the tab –Activity</ strong></li> 
Deleted: <li><strong>Enter the fields</strong></li> 
Deleted: </ul> 
Deleted: <strong> </strong> 
Deleted: <strong>To perform more than one activity</strong> Added: <strong> Path to view the various reports:</strong>
Deleted: <ul> 
Deleted: <li><strong>Click add row and enter the field</strong></li> 
Deleted: </ul> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong>STEP4. To create an  Asset in the Masters</strong> 
Deleted: <strong>Click Maintanence&gt; Masters&gt; Asset</strong> 
Deleted: <strong> </strong> 
Deleted: &nbsp; 
Deleted: &nbsp; 
Deleted: <ul> 
Deleted: <li><strong>Select Asset Type </strong></li> 
Deleted: <li><strong>Enter Asset Code</strong></li> 
Deleted: <li><strong>Enter Asset Name</strong></li> 
Deleted: <li><strong>Enter the batch serial</strong></li> 
Deleted: <li><strong>Select the tab - classification and fill all the details</strong></li> 
Deleted: <li><strong>Select the tab - parameter and fill all the details</strong></li> 
Deleted: </ul> 
Deleted: <strong> </strong> 
 Added: !. Maintenance &gt;Reports&gt;Call &gt;Call registration &gt; Pending calls&gt;Filter options &gt;settings &gt;PDF
 Added: 2.Maintenance&gt; Reports&gt;Call&gt;Call registration &gt; Naturewise call summary
Unchanged: &nbsp;Unchanged: &nbsp;
 Added: <strong>Video Links:</strong>
 Added: <a href="http:// help.goodbookserp.com/ ?p=9628">Asset &amp; Activity creation Watch Video  Click here </a>
 Added: <a href="http:// help.goodbookserp.com/ ?p=9628">How to register a call Watch Video Click here</a>
Unchanged: &nbsp;Unchanged: &nbsp;
Unchanged: &nbsp;Unchanged: &nbsp;
Unchanged: &nbsp;Unchanged: &nbsp;
Unchanged: <strong> </strong>Unchanged: <strong> </strong>
Deleted: <ul> 
Deleted: <li><strong>Select the tab – FMS </strong></li> 
Deleted: </ul> 
Unchanged: <strong> </strong>Unchanged: <strong> </strong>
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <ul> 
Deleted: <li><strong>Select Party type as Own asset</strong></li> 
Deleted: <li><strong>Select Running status as Running</strong></li> 
Deleted: <li><strong>Select energy metering as Not required</strong></li> 
Deleted: <li><strong>Click update</strong></li> 
Deleted: </ul> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong>STEP5.To Select Asset &amp; activity</strong> 
Deleted: <ul> 
Deleted: <li><strong>Click Masters&gt;Asset Activity</strong></li> 
Deleted: <li><strong>Select Type as asset</strong></li> 
Deleted: <li><strong>Select Asset Type</strong></li> 
Deleted: <li><strong>Select Asset</strong></li> 
Deleted: <li><strong>Select Activity </strong></li> 
Deleted: <li><strong>Select the Assigned to</strong></li> 
Deleted: <li><strong>Select the Parameter set</strong></li> 
Deleted: <li><strong>Select the tab – Select Month under Scheduler</strong></li> 
Deleted: <li><strong>Click update</strong></li> 
Deleted: </ul> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong>STEP5. To  create  list of Parameters in the Masters</strong> 
Deleted: <strong>Click Masters&gt;Parameter</strong> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <ul> 
Deleted: <li><strong>Create a code</strong></li> 
Deleted: <li><strong>Enter the name of parameter</strong></li> 
Deleted: <li><strong>Enter all the fields</strong></li> 
Deleted: <li><strong>Click save</strong></li> 
Deleted: </ul> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong>Step6.To set the Parameters for an Asset</strong> 
Deleted: <strong>Click Masters&gt;ParameterSet</strong> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <ul> 
Deleted: <li><strong>Select the Code(of Asset)</strong></li> 
Deleted: <li><strong>Select the Name (of Asset)</strong></li> 
Deleted: <li><strong>Enter the remarks</strong></li> 
Deleted: <li><strong>Select the parameters to set</strong></li> 
Deleted: <li><strong>For more entries add click Add Row</strong></li> 
Deleted: <li><strong>Click update</strong></li> 
Deleted: </ul> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong>STEP7: To create the Party with Branch</strong> 
Deleted: <strong> </strong> 
Deleted: <strong>Click Accounts&gt;Master&gt; Ledger&gt;Party with Branch</strong> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <ul> 
Deleted: <li><strong>Create the codecategory as Party</strong></li> 
Deleted: <li><strong>Create the Control Account</strong></li> 
Deleted: <li><strong>Create the code for the Party (Auto Generated)</strong></li> 
Deleted: <li><strong>Enter the Name, Shortname, currency of the Party</strong></li> 
Deleted: <li><strong>Select account</strong></li> 
Deleted: <li><strong>Select the Account Group </strong></li> 
Deleted: <li><strong>Select the tab – Party branch and enter all the fields.</strong></li> 
Deleted: <li><strong>Click update</strong></li> 
Deleted: </ul> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong>STEPS TO DO ON A REGULAR BASIS:</strong> 
Deleted: <strong> </strong> 
Deleted: <strong>STEP1: To Create Task</strong> 
Deleted: <strong> </strong> 
Deleted: <strong>Click Maintenance&gt; Transactions&gt;Task Generation</strong> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <ul> 
Deleted: <li><strong>Select Asset Type</strong></li> 
Deleted: <li><strong>Select the Asset</strong></li> 
Deleted: <li><strong>Select the Party Branch</strong></li> 
Deleted: <li><strong>Select the Activity</strong></li> 
Deleted: <li><strong>Enter the Task date</strong></li> 
Deleted: <li><strong>Generate< /strong></li> 
Deleted: </ul> 
Deleted: <strong> </strong> 
Deleted: <strong>STEP2: To schedule a Task</strong> 
Deleted: <strong>ClickMaintenance&gt; Transactions&gt; Task</strong> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <ul> 
Deleted: <li><strong>Task Number is Auto generated</strong></li> 
Deleted: <li><strong>Select the Name of the Task</strong></li> 
Deleted: <li><strong>Select the Nature as Asset</strong></li> 
Deleted: <li><strong>Select the type as Task</strong></li> 
Deleted: <li><strong>Select the Activity, In-charge, Assigned-to</ strong></li> 
Deleted: <li><strong>Enter all the fields in Plan.</strong></li> 
Deleted: </ul> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong>WORK FLOW FOR CALL REGISTRATION:</strong> 
Deleted: <strong>STEP1: To register the calls which comes for small functional Problems </strong> 
Deleted: <strong>   Click CRM&gt;Masters&gt;Call Registration</strong> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <ul> 
Deleted: <li><strong>Select the Number(Auto Generated)</strong></li> 
Deleted: <li><strong>Select the Type as Call Registration< /strong></li> 
Deleted: <li><strong>Enter the Date</strong></li> 
Deleted: <li><strong>Enter the problem</strong></li> 
Deleted: <li><strong>Select all the fields underCall From &amp;callTo</ strong></li> 
Deleted: <li><strong>Select Type of call as Indoor</strong></li> 
Deleted: <li><strong>Select call status as working</strong></li> 
Deleted: <li><strong>Select the Call details tab and Enter all the fields.</strong></li> 
Deleted: <li><strong>Click update</strong></li> 
Deleted: </ul> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong>STEP2:To register calls which comes for Breakdown</strong> 
Deleted: <strong> </strong> 
Deleted: <strong>Click Maintenance&gt; Breakdown&gt; Transaction</strong> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <ul> 
Deleted: <li><strong>Select the Number(Auto Generated)</strong></li> 
Deleted: <li><strong>Select the Type as Call Registration< /strong></li> 
Deleted: <li><strong>Enter the Date</strong></li> 
Deleted: <li><strong>Enter the problem</strong></li> 
Deleted: <li><strong>Select all the fields under Call From &amp;callTo</ strong></li> 
Deleted: <li><strong>Select Type of call as Outdoor</strong></li> 
Deleted: <li><strong>Select call status as stop</strong></li> 
Deleted: <li><strong>Select the Call details tab and Enter all the fields.</strong></li> 
Deleted: <li><strong>Click update</strong></li> 
Deleted: </ul> 
Deleted: <strong> </strong> 
Deleted: <strong> </strong> 
Deleted: <strong>CALLS &amp; TASK MANAGEMENT:</strong> 
Deleted: <strong> </strong> 
Deleted: <strong>To schedule and assign the calls and tasks</strong> 
Deleted: <strong> </strong> 
Deleted: <ul> 
Deleted: <li><strong>Maintenance&gt; Transaction&gt;Workbench< /strong></li> 
Deleted: <li><strong>CRM&gt; Transaction&gt;Workbench< /strong></li> 
Deleted: </ul> 
Unchanged: <strong> </strong>Unchanged: <strong> </strong>
Unchanged: <strong> </strong>Unchanged: <strong> </strong>
Unchanged: <strong> </strong>Unchanged: <strong> </strong>
Unchanged: <strong> </strong>Unchanged: <strong> </strong>
Unchanged: <strong> </strong>Unchanged: <strong> </strong>
Unchanged: <strong> </strong>Unchanged: <strong> </strong>
 Added: &nbsp;

Note: Spaces may be added to comparison text to allow better line wrapping.

Translate »