Maintenance processes are necessary to effectively run an efficient, continuous manufacturing operation, business, or service operation. Also, preventive maintenance is cost-effective when compared to the cost of a major breakdown at which time there is no production.
The asset activity screen is used to schedule preventive maintenance for the equipment owned by the organization.
Path: Maintenance>Master>Asset Activity
- Type: The type of equipment in which the maintenance process will be carried out might be of different types such as asset, machine, resources. Select the type depending on the equipment.
- Asset Type: Select the appropriate asset type. A group of assets will be combined under a single asset type depending on the function, usage, etc. The list will show the existing asset types.
- Asset: The asset type is consists of various assets, each and every asset will be differentiated from another using the specific name. Enter the required asset name.
- Activity: Different maintenance procedures are already created in the activity screen. The list of various activities will be displayed, select the appropriate maintenance activity.
- Assigned To: This field is used to assign the maintenance activity to the particular user/particular group of users or specific designation/specific employee.
User: Select this button to assign the maintenance activity to the particular user.
User Group: Select this button to assign the maintenance activity to a particular group of users.
Role: To assign the maintenance activities to a particular role such as manager, technician, etc., select this button.
Employee: To assign the maintenance activities to a specific employee, select this button.
6. Parameter Set: The parameter set which is already created will be listed here. The parameter set will consist of various checklists to perform the maintenance process.
7. Last Generated Till: This field will show the date of the last maintenance occurred.
8. Advance: The advance field is used to insert the cron expression which is created externally.
The Cron Gen Link button is used to create a new cron expression as per the requirements.
9. Duration: The total duration taken to complete the maintenance process will be entered here.
10. Grace Time: An additional grace time will be used for the maintenance process in case the process exceeds a normal duration. The required grace time is needed to be entered here.
11. Ticket Time: The ticket time can be a time period taken to raise a query if breakdown maintenance occurs.
12. Expiry Time: The total time period will be taken to complete the maintenance process is needed to be entered here.
13. Cron Generator: The cron generator is used to generate the cron expressions.
14. Scheduler: The scheduler will have multiple tabs to specify a month, dates, week, days for the maintenance process.
- Select Months: The month in which the maintenance process is needed to be selected here.
- Select Dates: The dates of a selected month in which the maintenance process is needed to be selected here.
- Days of Week:
- Days/Range:
- Time Range:
15. Click the Save button.
Revisions
- February 8, 2022 @ 10:35:09 [Current Revision] by admin
- February 8, 2022 @ 10:35:09 by arul
- February 8, 2022 @ 10:34:44 [Autosave] by arul
- November 9, 2021 @ 04:18:17 by arul
- November 9, 2021 @ 04:17:25 by arul
- November 9, 2021 @ 04:15:16 by arul
- November 9, 2021 @ 04:00:21 by arul
- June 28, 2021 @ 08:18:30 by Surya BALAMURUGAN
- June 28, 2021 @ 08:17:20 [Autosave] by Surya BALAMURUGAN
- June 28, 2021 @ 08:14:55 by Surya BALAMURUGAN
- June 28, 2021 @ 08:11:23 by Surya BALAMURUGAN
- June 28, 2021 @ 07:51:31 by Surya BALAMURUGAN
- June 28, 2021 @ 07:02:20 by Surya BALAMURUGAN
- January 9, 2019 @ 06:02:09 by vv
- November 10, 2018 @ 06:42:38 by admin
- November 10, 2018 @ 06:42:28 [Autosave] by admin
- November 9, 2018 @ 08:37:53 by admin