Item Master – Planning

Item planning contains information about the plan method, production nature and other production related details. im-plan Fields & its description:
  • Plan Method
Select the plan method for the item which maybe: MRP          -    Based on Material Requirements Planning method. Min/Max -   Based on minimum or maximum stock. ROL            -   Reorder level where inventory level at which a company would place a new order.
  • MRP Method
If your plan method is MRP then specify the MRP method in this field.   There are three classifications: MPS - Master Production Schedule DRP - Distribution Resource Planning MRP - Material Requirements Planning The plans maybe single or a combination, so select the option that most suits your organization.
  • Make or Buy
Select if the item is manufactured or bought.
  • Production Nature
  • Safety Method
If your choice is quantity then it means the safety method is immediate, Days if grace days are allowed for minimum stock kept in waiting.
  • Safety Level
Enter the safety level of the item.
  • Planner
Select the planner name of the item in this field.
  • Plan Group
The item must belong to a specific manufacturing plan group. E.g. Sheets Group, Cubicles Group, etc. Lead Time Lead time is the time interval it takes from initiation to execution of the manufacturing of a product.                

Revision Differences

May 20, 2015 @ 10:58:28Current Revision
Content
Unchanged: Item planning contains information about the plan method, production nature and other production related details.Unchanged: Item planning contains information about the plan method, production nature and other production related details.
Unchanged: <a href="http:// help.goodbookserp.com/wp- content/uploads/2015/05/im- plan.png"><img class="alignnone size-full wp-image-3611" src="http://help.goodbookserp.com/ wp-content/uploads/2015/05/ im-plan.png" alt="im-plan" width="968" height="470" /></a>Unchanged: <a href="http:// help.goodbookserp.com/wp- content/uploads/2015/05/im- plan.png"><img class="alignnone size-full wp-image-3611" src="http://help.goodbookserp.com/ wp-content/uploads/2015/05/ im-plan.png" alt="im-plan" width="968" height="470" /></a>
Unchanged: <strong>Fields &amp; its description:</strong>Unchanged: <strong>Fields &amp; its description:</strong>
Unchanged: <ul>Unchanged: <ul>
Unchanged: <li><strong>Plan Method</strong></li>Unchanged: <li><strong>Plan Method</strong></li>
Unchanged: </ul>Unchanged: </ul>
Unchanged: Select the plan method for the item which maybe:Unchanged: Select the plan method for the item which maybe:
Unchanged: <em>MRP          -    </em>Based on Material Requirements Planning method.Unchanged: <em>MRP          -    </em>Based on Material Requirements Planning method.
Unchanged: <em>Min/Max -   </em>Based on minimum or maximum stock.Unchanged: <em>Min/Max -   </em>Based on minimum or maximum stock.
Unchanged: <em>ROL            -   </em>Reorder level where inventory level at which a company would place a new order.Unchanged: <em>ROL            -   </em>Reorder level where inventory level at which a company would place a new order.
Unchanged: <ul>Unchanged: <ul>
Unchanged: <li><strong>MRP Method</strong></li>Unchanged: <li><strong>MRP Method</strong></li>
Unchanged: </ul>Unchanged: </ul>
Unchanged: If your plan method is MRP then specify the MRP method in this field.   There are three classifications:Unchanged: If your plan method is MRP then specify the MRP method in this field.   There are three classifications:
Unchanged: MPS - Master Production ScheduleUnchanged: MPS - Master Production Schedule
Unchanged: DRP - Distribution Resource PlanningUnchanged: DRP - Distribution Resource Planning
Unchanged: MRP - Material Requirements PlanningUnchanged: MRP - Material Requirements Planning
Unchanged: The plans maybe single or a combination, so select the option that most suits your organization.Unchanged: The plans maybe single or a combination, so select the option that most suits your organization.
Deleted: &nbsp;Added: <ul>
 Added: <li><strong>Make or Buy</strong></li>
 Added: </ul>
 Added: Select if the item is manufactured or bought.
 Added: <ul>
 Added: <li><strong>Production Nature</strong></li>
 Added: <li><strong>Safety Method</strong></li>
 Added: </ul>
 Added: If your choice is <em>quantity </em>then it means the safety method is immediate, <em>Days </em>if grace days are allowed for minimum stock kept in waiting.
 Added: <ul>
 Added: <li><strong>Safety Level</strong></li>
 Added: </ul>
 Added: Enter the safety level of the item.
 Added: <ul>
 Added: <li><strong>Planner< /strong></li>
 Added: </ul>
 Added: Select the planner name of the item in this field.
 Added: <ul>
 Added: <li><strong>Plan Group</strong></li>
 Added: </ul>
 Added: The item must belong to a specific manufacturing plan group. E.g. Sheets Group, Cubicles Group, etc.
 Added: <strong>Lead Time</strong>
 Added: Lead time is the time interval it takes from initiation to execution of the manufacturing of a product.
Unchanged: &nbsp;Unchanged: &nbsp;
Unchanged: &nbsp;Unchanged: &nbsp;
Unchanged: &nbsp;Unchanged: &nbsp;
Unchanged: &nbsp;Unchanged: &nbsp;
Unchanged: &nbsp;Unchanged: &nbsp;
Unchanged: &nbsp;Unchanged: &nbsp;
Unchanged: &nbsp;Unchanged: &nbsp;
Unchanged: &nbsp;Unchanged: &nbsp;

Note: Spaces may be added to comparison text to allow better line wrapping.

Translate »