- Plan Method
- MRP Method
- Make or Buy
- Production Nature
- Safety Method
- Safety Level
- Planner
- Plan Group
Contents
Revisions
- May 20, 2015 @ 11:45:56 [Current Revision] by vv
- May 20, 2015 @ 11:45:56 by vv
- May 20, 2015 @ 11:41:27 [Autosave] by vv
- May 20, 2015 @ 11:32:52 by vv
- May 20, 2015 @ 11:25:43 by vv
- May 20, 2015 @ 11:00:10 by vv
- May 20, 2015 @ 10:58:28 by vv
- May 20, 2015 @ 10:23:09 by vv
- May 20, 2015 @ 09:25:58 by vv
- May 20, 2015 @ 09:21:52 by vv
- May 20, 2015 @ 09:07:53 by vv
- May 20, 2015 @ 09:06:47 by vv
- May 20, 2015 @ 07:53:29 by vv
- May 20, 2015 @ 07:37:02 by vv
Revision Differences
May 20, 2015 @ 09:06:47 | Current Revision | ||
---|---|---|---|
Content | |||
Unchanged: Item planning contains information about the plan method, production nature and other production related details. | Unchanged: Item planning contains information about the plan method, production nature and other production related details. | ||
Unchanged: <a href="http:// help.goodbookserp.com/wp- content/uploads/2015/05/im- plan.png"><img class="alignnone size-full wp-image-3611" src="http://help.goodbookserp.com/ wp-content/uploads/2015/05/ im-plan.png" alt="im-plan" width="968" height="470" /></a> | Unchanged: <a href="http:// help.goodbookserp.com/wp- content/uploads/2015/05/im- plan.png"><img class="alignnone size-full wp-image-3611" src="http://help.goodbookserp.com/ wp-content/uploads/2015/05/ im-plan.png" alt="im-plan" width="968" height="470" /></a> | ||
Added: <strong>Fields & its description:</strong> | |||
Added: <ul> | |||
Added: <li><strong>Plan Method</strong></li> | |||
Added: </ul> | |||
Added: Select the plan method for the item which maybe: | |||
Added: <em>MRP - </em>Based on Material Requirements Planning method. | |||
Added: <em>Min/Max - </em>Based on minimum or maximum stock. | |||
Added: <em>ROL - </em>Reorder level where inventory level at which a company would place a new order. | |||
Added: <ul> | |||
Added: <li><strong>MRP Method</strong></li> | |||
Added: </ul> | |||
Added: If your plan method is MRP then specify the MRP method in this field. There are three classifications: | |||
Added: MPS - Master Production Schedule | |||
Added: DRP - Distribution Resource Planning | |||
Added: MRP - Material Requirements Planning | |||
Added: The plans maybe single or a combination, so select the option that most suits your organization. | |||
Added: <ul> | |||
Added: <li><strong>Make or Buy</strong></li> | |||
Added: </ul> | |||
Added: Select if the item is manufactured or bought. | |||
Added: <ul> | |||
Added: <li><strong>Production Nature</strong></li> | |||
Added: <li><strong>Safety Method</strong></li> | |||
Added: </ul> | |||
Added: If your choice is <em>quantity </em>then it means the safety method is immediate, <em>Days </em>if grace days are allowed for minimum stock kept in waiting. | |||
Added: <ul> | |||
Added: <li><strong>Safety Level</strong></li> | |||
Added: </ul> | |||
Added: Enter the safety level of the item. | |||
Added: <ul> | |||
Added: <li><strong>Planner< /strong></li> | |||
Added: </ul> | |||
Added: Select the planner name of the item in this field. | |||
Added: <ul> | |||
Added: <li><strong>Plan Group</strong></li> | |||
Added: </ul> | |||
Added: The item must belong to a specific manufacturing plan group. E.g. Sheets Group, Cubicles Group, etc. | |||
Added: <strong>Lead Time</strong> | |||
Added: Lead time is the time interval it takes from initiation to execution of the manufacturing of a product. | |||
Added: | |||
Added: | |||
Added: | |||
Added: | |||
Added: | |||
Added: | |||
Added: | |||
Added: |
Note: Spaces may be added to comparison text to allow better line wrapping.