Planning the PM Schedule
In this section the PM will be scheduled. The period and duration will be set in this section Days and Hours : Set the number days and hours required for the maintenance Grace and Expiry Time : There is an option to set extra time and maximum time for the Maintenance Start and End date : Set the planning date ( Duration )Contents
Revisions
- January 9, 2019 @ 04:09:44 [Current Revision] by vv
- October 29, 2021 @ 04:54:31 [Autosave] by arul
- January 9, 2019 @ 04:09:44 by vv
- January 9, 2019 @ 04:09:20 by vv
- January 9, 2019 @ 04:08:50 [Autosave] by vv
- January 6, 2019 @ 09:25:26 by vv
- January 6, 2019 @ 09:22:34 by vv
- January 6, 2019 @ 08:19:21 by vv
- January 6, 2019 @ 08:02:17 by vv
Revision Differences
January 6, 2019 @ 08:19:21 | Current Revision | ||
---|---|---|---|
Content | |||
Unchanged: Preventive Maintenance Scheduling (PMS) | Unchanged: Preventive Maintenance Scheduling (PMS) | ||
Unchanged: PMS UI | Unchanged: PMS UI | ||
Unchanged: <a href="https:/ /help.goodbookserp.com/wp- content/uploads/ 2019/01/PMS_ Scr1.png"><img class="alignnone size-full wp-image-10424" src="https:// help.goodbookserp.com/wp- content/uploads/ 2019/01/PMS_Scr1.png" alt="" width="1092" height="385" /></a> | Unchanged: <a href="https:/ /help.goodbookserp.com/wp- content/uploads/ 2019/01/PMS_ Scr1.png"><img class="alignnone size-full wp-image-10424" src="https:// help.goodbookserp.com/wp- content/uploads/ 2019/01/PMS_Scr1.png" alt="" width="1092" height="385" /></a> | ||
Unchanged: <a href="https:/ /help.goodbookserp.com/wp- content/uploads/ 2019/01/PMS_ Scr2.png"><img class="alignnone size-full wp-image-10425" src="https:// help.goodbookserp.com/wp- content/uploads/ 2019/01/PMS_Scr2.png" alt="" width="849" height="261" /></a> | Unchanged: <a href="https:/ /help.goodbookserp.com/wp- content/uploads/ 2019/01/PMS_ Scr2.png"><img class="alignnone size-full wp-image-10425" src="https:// help.goodbookserp.com/wp- content/uploads/ 2019/01/PMS_Scr2.png" alt="" width="849" height="261" /></a> | ||
Unchanged: <strong>Number :</strong> Auto generated by Goodbooks based on setting | Unchanged: <strong>Number :</strong> Auto generated by Goodbooks based on setting | ||
Unchanged: <strong>Name :</strong> Set the name of property to plan preventive scheduling. Say for example Power Generator, Machinery, buildings etc., | Unchanged: <strong>Name :</strong> Set the name of property to plan preventive scheduling. Say for example Power Generator, Machinery, buildings etc., | ||
Unchanged: <strong>Description :</strong> Can give addition details about the property. | Unchanged: <strong>Description :</strong> Can give addition details about the property. | ||
Unchanged: <strong>Nature :</strong> Nature of property like Fixed Asset property, Machinery | Unchanged: <strong>Nature :</strong> Nature of property like Fixed Asset property, Machinery | ||
Unchanged: <strong>Type :</strong> The preventive maintenance of the property handled by a person per activity or may be by a team. Here if the PM ( preventive maintenance) is by a person then set "Task". The PM is by a team then set "Work". Further , the work may have more than one task. | Unchanged: <strong>Type :</strong> The preventive maintenance of the property handled by a person per activity or may be by a team. Here if the PM ( preventive maintenance) is by a person then set "Task". The PM is by a team then set "Work". Further , the work may have more than one task. | ||
Unchanged: Say for example a machine may need electrical, electronic , mechanical maintenance for the period of time regularly. In this case there are three different skill people are needed to handle the PMS. In this situation set Type option as "Work" and electrical, electronic and mechanical are the Task under the Work. | Unchanged: Say for example a machine may need electrical, electronic , mechanical maintenance for the period of time regularly. In this case there are three different skill people are needed to handle the PMS. In this situation set Type option as "Work" and electrical, electronic and mechanical are the Task under the Work. | ||
Deleted: <strong>Parent : </strong>If | Added: <strong>Parent : </strong>If any parent task related to this task then set here. The parent task will be closed once all the child task(s) is closed. | ||
Unchanged: <strong>Requester :</strong> If any one request this PMS then set the name of the requester. | Unchanged: <strong>Requester :</strong> If any one request this PMS then set the name of the requester. | ||
Deleted: <strong>In-charge :</strong> Set the person name who is | Added: <strong>In-charge :</strong> Set the person name who is responsible of the PMS. | ||
Deleted: <strong>Activity :</strong> Set the type of activity. Say for example the property may have Monthly or weekly or daily basis | Added: <strong>Activity :</strong> Set the type of activity. Say for example the property may have Monthly or weekly or daily basis maintenance | ||
Unchanged: <strong>Assigned To : </strong>Set the type of person or a company for this task. | Unchanged: <strong>Assigned To : </strong>Set the type of person or a company for this task. | ||
Unchanged: <strong>Assignee : </strong> Set the name of person who is going to attend this task. | Unchanged: <strong>Assignee : </strong> Set the name of person who is going to attend this task. | ||
Added: <p style="text-align: left;"><span style="text-decoration: underline;"><em>Planning the PM Schedule</em></span></p> | |||
Added: In this section the PM will be scheduled. The period and duration will be set in this section | |||
Added: <strong>Days and Hours :</strong> Set the number days and hours required for the maintenance | |||
Added: <strong>Grace and Expiry Time : </strong>There is an option to set extra time and maximum time for the Maintenance | |||
Deleted: <p style="text-align: center;">Planning the Schedule</p> | Added: <strong>Start and End date :</strong> Set the planning date ( Duration ) | ||
Deleted: | |||
Deleted: |
Note: Spaces may be added to comparison text to allow better line wrapping.