The Planning Workbench is a working environment for stock planners. Planner Workbench helps companies release the demands to the Production department as a work order.
Navigation Path: Planning>Transaction>Planner Workbench
- Follow the above steps to open the ‘Planner Workbench’ screen.

- Select the filter option to load the details in the grid.

- Select the MPS radio button from the ‘Type’ field.

- Choose the already created ‘Master Schedule’, ’MRP’ and ‘MRP Run’ from the respective drop-down menu.

- After selecting the filter, click apply which results in the list of items that can be converted to a Work order.

- Select the item in the row and click the more button at end of the row.

- Once clicked the detailed screen opens. Select the format in which the item is to be released from the ‘Release As’ drop-down menu.

- Select the BizTransaction for work order creation.

- Enter the quantity to be manufactured in the ‘Quantity’ field and change the ‘Plan Status’ from Unreleased to Released and save the Work Order.

- Now the status screen will display Status as ‘R’ denoting that the Work order is released only if the whole quantity is released. Within this 4 options will be available: Release, Unreleased, Hold and To be released.

- If needed on the Main screen multiple work orders can be updated simultaneously with options such as 1. Release all Unreleased 2. Release all To Be Released and 3. Release Selected
- To ensure the already created Work Order is valid, use the following Navigation Path: Production>Transaction>Workorder>Workorder
Contents
Revisions
- December 12, 2022 @ 05:43:26 [Current Revision] by admin
- December 8, 2022 @ 10:34:09 by arul
- December 8, 2022 @ 10:33:41 by arul
Revision Differences
There are no differences between the December 8, 2022 @ 10:34:09 revision and the current revision. (Maybe only post meta information was changed.)