Every item shall have its own specifications and the specifications tab of the item master stores information about the item’s dimensions, revisions, raw material source, etc.
Fields & its description:
- Type
The type can be indicated as Item or Template of an item.
Select Template if the item is a prototype and this option usually indicates that it is not for sale.
- Additional Specifications
Select any additional specification if there are entries created for this, related to the item.
There is a Details button that allows you to add extra information about the specification.
- Introduced Date
Specify the date when the item was first introduced.
- Item Revised
If this is a revised item where changes have been made to its specifications then select Yes or else No.
- Revised From/To
This is the period when the item revision is valid. The revision start date is entered in Revised From and its end is noted in Revised To date.
- Height/Weight
Enter the height and weight of the item in millimeters (mm) and kilograms (kg) respectively.
- Length, Breadth and Thickness are the other dimensions that can be specified about the item. Enter all the values in mm.
- Variable Size Item
If this item is subject to variations in size and it does not maintain a standard dimension then select Yes.
- Drawing No.
This is a reference to the document containing a visual representation of the item.
- Catalogue No.
Specify the catalogue to which this item belongs.
- BOM Type
Bill of material of this item can be of any type. Select a type from the given options.
Standard – Relates to manufactured BOM type.
Non Standard – In case of variable materials used.
Standard Process Wise – Indicates standard process wise specification of BOM.
Raw Material – Similar to BOM of a BOM (meta).
Nesting Plan – If this BOM is a split type specification, then select this type.
- Raw Material Item
If Raw Material was your BOM type then enter the name of the raw material used for the item.
- Raw Material SKU
Specify the raw material SKU of the item here.
- Quantity
The quantity used to create the item can be mentioned.
- Material Group
The item must belong to a specific material group from which it is manufactured. Enter the material group.
- Nesting Plan
Select the nesting plan used by the item to reduce wastage.
- Primary Routing
Primary routing refers to the sequence of processes, select the routing type used for this item.
Revisions
- May 16, 2015 @ 12:05:17 [Current Revision] by vv
- May 16, 2015 @ 12:05:17 by vv
- May 16, 2015 @ 12:04:32 [Autosave] by vv
- May 16, 2015 @ 12:03:26 by vv
- May 16, 2015 @ 12:01:03 by vv
- May 16, 2015 @ 11:59:30 by vv
- May 16, 2015 @ 11:56:40 by vv
- May 16, 2015 @ 11:54:26 by vv
- May 16, 2015 @ 10:20:26 by vv
- May 16, 2015 @ 10:15:54 by vv
- May 16, 2015 @ 10:07:56 by vv
- May 16, 2015 @ 10:05:08 by vv
- May 5, 2015 @ 07:19:54 by vv
- May 5, 2015 @ 07:17:20 by vv
- May 5, 2015 @ 07:04:10 by vv
- May 5, 2015 @ 07:00:08 by vv
- May 4, 2015 @ 13:01:54 by vv
- May 4, 2015 @ 12:59:26 by vv
- May 4, 2015 @ 12:56:01 by vv
- May 4, 2015 @ 12:52:55 by vv
- May 4, 2015 @ 12:45:57 by vv
- May 4, 2015 @ 12:43:35 by vv
- May 4, 2015 @ 12:19:55 by vv
- May 4, 2015 @ 11:58:48 by vv
- May 4, 2015 @ 11:38:44 by vv
- May 4, 2015 @ 11:27:00 by vv