Every item shall have its own specifications and the specifications tab of the item master stores information about the item's dimensions, revisions, raw material source, etc.
Fields & its description:
The type can be indicated as Item or Template of an item.
Select Template if the item is a prototype and this option usually indicates that it is not for sale.
- Additional Specifications
Select any additional specification if there are entries created for this, related to the item.
There is a Details button that allows you to add extra information about the specification.
Specify the date when the item was first introduced.
If this is a revised item where changes have been made to its specifications then select Yes or else No.
This is the period when the item revision is valid. The revision start date is entered in Revised From and its end is noted in Revised To date.
Enter the height and weight of the item in millimeters (mm) and kilograms (kg) respectively.
- Length, Breadth and Thickness are the other dimensions that can be specified about the item. Enter all the values in mm.
If this item is subject to variations in size and it does not maintain a standard dimension then select Yes.
This is a reference to the document containing a visual representation of the item.
Specify the catalogue to which this item belongs.
Bill of material of this item can be of any type. Select a type from the given options.
Standard - Relates to manufactured BOM type.
Non Standard - In case of variable materials used.
Standard Process Wise - Indicates standard process wise specification of BOM.
Raw Material - Similar to BOM of a BOM (meta).
Nesting Plan - If this BOM is a split type specification, then select this type.
If Raw Material was your BOM type then enter the name of the raw material used for the item.
Specify the raw material SKU of the item here.
The quantity used to create the item can be mentioned.
The item must belong to a specific material group from which it is manufactured. Enter the material group.
Select the nesting plan used by the item to reduce wastage.
Primary routing refers to the sequence of processes, select the routing type used for this item.
Revisions
- May 16, 2015 @ 12:05:17 [Current Revision] by vv
- May 16, 2015 @ 12:05:17 by vv
- May 16, 2015 @ 12:04:32 [Autosave] by vv
- May 16, 2015 @ 12:03:26 by vv
- May 16, 2015 @ 12:01:03 by vv
- May 16, 2015 @ 11:59:30 by vv
- May 16, 2015 @ 11:56:40 by vv
- May 16, 2015 @ 11:54:26 by vv
- May 16, 2015 @ 10:20:26 by vv
- May 16, 2015 @ 10:15:54 by vv
- May 16, 2015 @ 10:07:56 by vv
- May 16, 2015 @ 10:05:08 by vv
- May 5, 2015 @ 07:19:54 by vv
- May 5, 2015 @ 07:17:20 by vv
- May 5, 2015 @ 07:04:10 by vv
- May 5, 2015 @ 07:00:08 by vv
- May 4, 2015 @ 13:01:54 by vv
- May 4, 2015 @ 12:59:26 by vv
- May 4, 2015 @ 12:56:01 by vv
- May 4, 2015 @ 12:52:55 by vv
- May 4, 2015 @ 12:45:57 by vv
- May 4, 2015 @ 12:43:35 by vv
- May 4, 2015 @ 12:19:55 by vv
- May 4, 2015 @ 11:58:48 by vv
- May 4, 2015 @ 11:38:44 by vv
- May 4, 2015 @ 11:27:00 by vv
Revision Differences
There are no differences between the May 16, 2015 @ 12:05:17 revision and the current revision. (Maybe only post meta information was changed.)