Work Load menu allows you to integrate the shift of each department with work type if required. There are two screens under Work Load, Work Load with Work Type and Work Load without Work Type.
- Work Load with Work Type:
There is the Version field at the start which helps you to store previous versions of the data and update data.
In the From and To fields, enter the period related to your Work Type from the calendar.
You can also click on the Fill Department button to enter all the stored department values.The shifts you have stored shall also be displayed as columns. There is also another table below which can be used to specify the work type within the department.
2. Work Load without Work Type:
This is the same as Work Load with Work Type but here there is no provision for work type. So there is only one table available.
Revisions
- October 30, 2015 @ 10:07:46 [Current Revision] by vv
- October 30, 2015 @ 10:07:46 by vv
- December 31, 2014 @ 09:45:30 by vv
- December 26, 2014 @ 06:22:20 [Autosave] by vv
- December 19, 2014 @ 10:05:29 by vv
- December 19, 2014 @ 10:04:34 by vv
- December 19, 2014 @ 10:00:40 by vv
- December 19, 2014 @ 07:37:31 by vv
- November 29, 2014 @ 05:12:13 by vv
- November 29, 2014 @ 05:11:09 by vv
- November 29, 2014 @ 05:06:30 by vv
Revision Differences
There are no differences between the October 30, 2015 @ 10:07:46 revision and the current revision. (Maybe only post meta information was changed.)