Work Center

Work center  is a sectional facility where the production work takes place. This usually refers to a machine or a set of machines where a certain production process is done. wrcenter Fields & its description
  • Code/Name
Enter a code and a relevant name for the work center entry that you want to save. E.g. Drilling WC, Cutting, etc.
  • Org Unit/Department
Specify the organization unit and department to which this work center belongs. Select the appropriate entries suitable to this work center.
  • Process
This work center is linked to a specific process, choose that process here.
  • No of Units
This refers to the total number of machinery units that make up this work center as a whole. If the work center is a single entity then enter 1.
  • UOM
Enter the Unit of Measurement with respect to the previous field. E.g. Nos.
  • Available Capacity
Enter the available capacity value in this field. If this work center has containers, you can note the capacity here.
  • Working Minutes
Type the overall working minutes of this work center for the whole day here.
  • Utilization %
Enter in percentage the actual utilization of the working time taking into account, breaks, delays, etc.
  • Efficiency %
Specify the efficiency % of this work center's output in this field.
  • Incharge
Select the employee responsible for this work center from the given list.
  • Cost Center
Choose the cost center that handles costs of this work center.
  • Calendar
Select the calendar specific to this work center. This helps in checking the availability.
  • Status
Status of this work center whether this is Pending or Active. If the work center is removed, select Deleted. If it is changed/improved then choose Amended. Inactive is selected if this work center is present but not in use. If this work center is only a record of earlier usage then choose Archived.
  • Start Time
Specify the time when this work center starts operating here.              

Contents

Revisions

Revision Differences

November 27, 2015 @ 12:07:26Current Revision
Content
Unchanged: Work center  is a sectional facility where the production work takes place. This usually refers to a machine or a set of machines where a certain production process is done.Unchanged: Work center  is a sectional facility where the production work takes place. This usually refers to a machine or a set of machines where a certain production process is done.
Unchanged: <a href="http:// help.goodbookserp.com/wp- content/uploads/ 2015/11/wrcenter.png"><img class="alignnone size-full wp-image-5641" src="http://help.goodbookserp.com/ wp-content/uploads/2015/11/ wrcenter.png" alt="wrcenter" width="1357" height="537" /></a>Unchanged: <a href="http:// help.goodbookserp.com/wp- content/uploads/ 2015/11/wrcenter.png"><img class="alignnone size-full wp-image-5641" src="http://help.goodbookserp.com/ wp-content/uploads/2015/11/ wrcenter.png" alt="wrcenter" width="1357" height="537" /></a>
Unchanged: <strong>Fields &amp; its description</strong>Unchanged: <strong>Fields &amp; its description</strong>
Unchanged: <ul>Unchanged: <ul>
Unchanged: <li><strong>Code< /strong>/<strong> Name</strong></li>Unchanged: <li><strong>Code< /strong>/<strong> Name</strong></li>
Unchanged: </ul>Unchanged: </ul>
Deleted: Enter a code and a relevant name for the work center entry that you want to save. E.g. Drilling WC, Cutting, etc. Added: Enter a code and a relevant name for the work center entry that you want to save. E.g. <em>Drilling WC, Cutting,</em> etc.
Unchanged: <ul>Unchanged: <ul>
Unchanged: <li><strong>Org Unit/Department< /strong></li>Unchanged: <li><strong>Org Unit/Department< /strong></li>
Unchanged: </ul>Unchanged: </ul>
Unchanged: Specify the organization unit and department to which this work center belongs. Select the appropriate entries suitable to this work center.Unchanged: Specify the organization unit and department to which this work center belongs. Select the appropriate entries suitable to this work center.
Unchanged: <ul>Unchanged: <ul>
Unchanged: <li><strong>Process< /strong></li>Unchanged: <li><strong>Process< /strong></li>
Unchanged: </ul>Unchanged: </ul>
Unchanged: This work center is linked to a specific process, choose that process here.Unchanged: This work center is linked to a specific process, choose that process here.
Unchanged: <ul>Unchanged: <ul>
Unchanged: <li><strong>No of Units</strong></li>Unchanged: <li><strong>No of Units</strong></li>
Unchanged: </ul>Unchanged: </ul>
Unchanged: This refers to the total number of machinery units that make up this work center as a whole. If the work center is a single entity then enter <em>1. </em>Unchanged: This refers to the total number of machinery units that make up this work center as a whole. If the work center is a single entity then enter <em>1. </em>
Unchanged: <ul>Unchanged: <ul>
Unchanged: <li><strong>UOM< /strong></li>Unchanged: <li><strong>UOM< /strong></li>
Unchanged: </ul>Unchanged: </ul>
Unchanged: Enter the Unit of Measurement with respect to the previous field. E.g. <em>Nos.</em>Unchanged: Enter the Unit of Measurement with respect to the previous field. E.g. <em>Nos.</em>
Unchanged: <ul>Unchanged: <ul>
Unchanged: <li><strong>Available Capacity</strong></li>Unchanged: <li><strong>Available Capacity</strong></li>
Unchanged: </ul>Unchanged: </ul>
Unchanged: Enter the available capacity value in this field. If this work center has containers, you can note the capacity here.Unchanged: Enter the available capacity value in this field. If this work center has containers, you can note the capacity here.
Deleted: &nbsp;Added: <ul>
 Added: <li><strong>Working Minutes</strong></li>
 Added: </ul>
 Added: Type the overall working minutes of this work center for the whole day here.
 Added: <ul>
 Added: <li><strong>Utilization %</strong></li>
 Added: </ul>
 Added: Enter in percentage the actual utilization of the working time taking into account, breaks, delays, etc.
 Added: <ul>
 Added: <li><strong>Efficiency %</strong></li>
 Added: </ul>
 Added: Specify the efficiency % of this work center's output in this field.
 Added: <ul>
 Added: <li><strong>Incharge< /strong></li>
 Added: </ul>
 Added: Select the employee responsible for this work center from the given list.
 Added: <ul>
 Added: <li><strong>Cost Center</strong></li>
 Added: </ul>
 Added: Choose the cost center that handles costs of this work center.
 Added: <ul>
 Added: <li><strong>Calendar< /strong></li>
 Added: </ul>
 Added: Select the calendar specific to this work center. This helps in checking the availability.
 Added: <ul>
 Added: <li><strong>Status< /strong></li>
 Added: </ul>
 Added: Status of this work center whether this is <em>Pending </em>or <em>Active. </em>If the work center is removed, select <em>Deleted. </em>If it is changed/improved then choose <em>Amended. </em><em>Inactive </em>is selected if this work center is present but not in use. If this work center is only a record of earlier usage then choose <em>Archived.</em>
Deleted: &nbsp;Added: <ul>
 Added: <li><strong>Start Time</strong></li>
 Added: </ul>
 Added: Specify the time when this work center starts operating here.
Unchanged: &nbsp;Unchanged: &nbsp;
Unchanged: &nbsp;Unchanged: &nbsp;
Unchanged: &nbsp;Unchanged: &nbsp;
Unchanged: &nbsp;Unchanged: &nbsp;
Unchanged: &nbsp;Unchanged: &nbsp;
Unchanged: &nbsp;Unchanged: &nbsp;
Unchanged: &nbsp;Unchanged: &nbsp;

Note: Spaces may be added to comparison text to allow better line wrapping.

Translate »