Item OU – Planning

Item OU - planning is used for managing the plan time, method and other related information regarding the item. io-pl Fields & its description:
  • Plan Method
Select the plan method for the item which maybe: MRP          –    Based on Material Requirements Planning method. Min/Max –   Based on minimum or maximum stock. ROL            –   Reorder level where inventory level at which a company would place a new order.
  • MRP Method
If your plan method is MRP then specify the MRP method in this field.   There are three classifications: MPS – Master Production Schedule DRP – Distribution Resource Planning MRP – Material Requirements Planning The plans maybe single or a combination, so select the option that most suits your organization.
  • Make or Buy
Select if the item is manufactured or bought.
  • Production Nature
  • Safety Method
If your choice is quantity then it means the safety method is immediate, Days if grace days are allowed for minimum stock kept in waiting.
  • Safety Level
Enter the safety level of the item.
  • Planner
Select the planner name of the item in this field.
  • Plan Group
The item must belong to a specific manufacturing plan group. E.g. Sheets Group, Cubicles Group, etc. Lead Time Lead time is the time interval it takes from initiation to execution of the manufacturing of a product.      

Contents

Revisions

  • May 21, 2015 @ 13:45:47 [Current Revision] by vv
  • May 21, 2015 @ 13:45:47 by vv

Revision Differences

There are no differences between the May 21, 2015 @ 13:45:47 revision and the current revision. (Maybe only post meta information was changed.)

Translate »