Navigation Path: Inventory > Master > Item Menu > Item
- Follow the above steps to open the ‘Item’ screen to create subitems.

- In the ‘Name’ text field, enter the desired name of the subitem to be added. (For reference, CMOS Battery is selected).

- Select the respective ‘Code Category’ suitable for the subitem from the dropdown menu.

- After selecting the name, category and description, various sections are shown below. In the ‘Classification Section make the following preferences for creating subitems:
- Select the ‘Type’ of the subitem from the dropdown list. (Choose raw materials for SubItem)
- Select ‘Category’: Represents the category to which the subitem is assigned.
- Select ‘Sub Category’: Represents the subcategory to which the subitem is assigned.
- Select Process Group: Denotes the process group to which the subitem is assigned.
- Select Group: Indicates the item group to which the subitem is assigned.
- Select Material Account: Denotes the type of material.

- In the ‘Planning’section make the following selection:
- Plan Method: Represents the type of the plan method to be used(MRP is selected for reference)
- Make or Buy: Denotes whether the item is to be made or bought (Buy is selected for reference denoting subitem)
- MRP Method: Indicated the type of MRP method to be implemented (MRP Planning is selected for reference)
- Safety Method: Select the type of safety method (Quantity is selected for reference)

- In the ‘Specification’ section make the following selection:
- Select BOM: Select the Bill Of Materials from the BOM already created. To know how to create a BOM, click here.
- Select BOM type: Represents the type of BOM applicable to the subitem.

- In the ‘Unit & Pack’ section make the following selection:
- Select Purchase Unit: Select the type of unit of purchase (Eg: Pcs/Nos/Meters/Litres etc)
- Select Stock Unit: Select the type of unit of stock (Eg: Pcs/Nos/Meters/Litres etc)

- In the ‘Duty & Tax’ section make the following selection:
- Select HSN: HSN code known as “Harmonized System of Nomenclature” is a 6-digit code introduced for the systematic categorization of goods all over the world.
- Select GST Table: Represents the percentage of Goods and Service Tax to be taxed on the subitem.

- In the ‘Store’ section make the following selection:
- Select Store: Choose the stores to which this subitem belongs.

- Click ‘Save’ when creating a new subitem it or ‘Update’ to apply the modifications to an already created subitem.