- Type
- Version
- From Date
- Resource Type
- Resource
- No Of Resource
- Time UOM
- Setup Time
- Cycle Time
- Batch Qty
- Variable Qty
- Duration
- Workload
Contents
Revisions
- December 21, 2015 @ 05:23:06 [Current Revision] by vv
- December 21, 2015 @ 05:23:06 by vv
- December 21, 2015 @ 05:20:41 by vv
- December 21, 2015 @ 05:15:25 by vv
- December 21, 2015 @ 05:11:18 by vv
- December 17, 2015 @ 06:29:28 by vv
- December 17, 2015 @ 05:45:24 by vv
- December 17, 2015 @ 05:03:15 by vv
- December 4, 2015 @ 07:08:15 by vv
- December 4, 2015 @ 06:42:40 by vv
- December 4, 2015 @ 06:19:34 by vv
- December 4, 2015 @ 06:06:08 by vv
Revision Differences
December 17, 2015 @ 05:03:15 | Current Revision | ||
---|---|---|---|
Content | |||
Deleted: Bill of resources lists out the resources required to complete the production of a finished product. These resources maybe labor, machinery or materials depending the requirement. | Added: Bill of resources lists out the resources required to complete the production of a finished product. These resources maybe labor, machinery or materials depending on the requirement. | ||
Unchanged: <a href="http:// help.goodbookserp.com/wp- content/uploads/ 2015/12/BOR.png"><img class="alignnone size-full wp-image-5708" src="http://help.goodbookserp.com/ wp-content/uploads/ 2015/12/BOR.png" alt="BOR" width="1355" height="539" /></a> | Unchanged: <a href="http:// help.goodbookserp.com/wp- content/uploads/ 2015/12/BOR.png"><img class="alignnone size-full wp-image-5708" src="http://help.goodbookserp.com/ wp-content/uploads/ 2015/12/BOR.png" alt="BOR" width="1355" height="539" /></a> | ||
Unchanged: <strong>Fields & its description:</strong> | Unchanged: <strong>Fields & its description:</strong> | ||
Unchanged: <ul> | Unchanged: <ul> | ||
Unchanged: <li><strong>Type< /strong></li> | Unchanged: <li><strong>Type< /strong></li> | ||
Unchanged: </ul> | Unchanged: </ul> | ||
Unchanged: Choose the target BOR type here. Depending on your selection, the fields below will be enabled or disabled. E.g. If your choice is <em>Work center,</em> only that field will be enabled. | Unchanged: Choose the target BOR type here. Depending on your selection, the fields below will be enabled or disabled. E.g. If your choice is <em>Work center,</em> only that field will be enabled. | ||
Unchanged: The following types are available: | Unchanged: The following types are available: | ||
Deleted: <em>Item</em> | |||
Deleted: <em>Process</em> | |||
Added: <strong>Item</strong> | |||
Added: <strong>Process (Routing) | |||
Deleted: <em>Operation</em> | Added: </strong> | ||
Deleted: <em>Nesting Plan</em> | |||
Deleted: <em>Work Center</em> | |||
Added: <strong>Operation</strong> | |||
Added: <strong>Nesting Plan</strong> | |||
Added: <strong>Work Center</strong> | |||
Added: <strong>Asset Ac</strong><strong> tivity</strong> | |||
Deleted: < | Added: <strong>Activity</strong> | ||
Deleted: <em>Activity</em> | |||
Deleted: | |||
Deleted: | |||
Deleted: | |||
Deleted: | |||
Added: <ul> | |||
Added: <li><strong>Version< /strong></li> | |||
Added: </ul> | |||
Added: After selecting your BOR type, choose a version. This version of the BOR will fill details in the grid below. | |||
Added: <ul> | |||
Added: <li><strong>From Date</strong></li> | |||
Added: </ul> | |||
Added: The dates in these fields relate to version validity. | |||
Added: The specifics are available in the grid below. | |||
Added: <ul> | |||
Added: <li><strong>Resource Type</strong></li> | |||
Added: </ul> | |||
Added: This is the type of resource used for the process. E.g. <em>Technician</em> | |||
Added: <ul> | |||
Added: <li><strong>Resource< /strong></li> | |||
Added: </ul> | |||
Added: Here the exact resource can be mentioned. This should correspond with the resource type selected above. E.g. <em>Technician Emplopyee.</em> | |||
Added: <ul> | |||
Added: <li><strong>No Of Resource</strong></li> | |||
Added: </ul> | |||
Added: The resource quantity can be specified in this field. Enter the number of resources needed. | |||
Added: <ul> | |||
Added: <li><strong>Time UOM</strong></li> | |||
Added: </ul> | |||
Added: This is the UOM for time which is usually in minutes based on your settings. | |||
Added: <ul> | |||
Added: <li><strong>Setup Time</strong></li> | |||
Added: </ul> | |||
Added: Setup time refers to the installation time of the resource. | |||
Added: <ul> | |||
Added: <li><strong>Cycle Time</strong></li> | |||
Added: </ul> | |||
Added: Cycle time is the duration of the resource process. | |||
Added: <ul> | |||
Added: <li><strong>Batch Qty</strong></li> | |||
Added: </ul> | |||
Added: Specify the quantity per batch of the process here. E.g. For a single production process, the total quantity for the batch can be x numbers. | |||
Added: <ul> | |||
Added: <li><strong>Variable Qty</strong></li> | |||
Added: </ul> | |||
Added: <ul> | |||
Added: <li><strong>Duration< /strong></li> | |||
Added: </ul> | |||
Added: This is the total duration of the process, calculated using the sum of cylce time and setup time. | |||
Added: <ul> | |||
Added: <li><strong>Workload< /strong></li> | |||
Added: </ul> | |||
Added: Workload is in relation to how much work was done vs the overall capacity. This is in percentage. | |||
Unchanged: | Unchanged: | ||
Unchanged: | Unchanged: | ||
Unchanged: | Unchanged: | ||
Unchanged: | Unchanged: |
Note: Spaces may be added to comparison text to allow better line wrapping.