W3vina.COM Free Wordpress Themes Joomla Templates Best Wordpress Themes Premium Wordpress Themes Top Best Wordpress Themes 2012

MRP Run Process

MRP (Material Requirements Planning) is a system for calculating how much material and components a product will need. MRP consists of three steps:

  • Taking stock of the materials and components,
  • Assessing the need for additional ones,
  • Following that, they must be scheduled for production or purchase.

Navigation Path: Planning>Transaction>MRP Run Process

  1. Follow the above steps to open the ‘MRP Run Process’ screen.
  1. Select the ‘Master schedule’ from the pick list.
  1. Select the ‘MRP Code’ from the dropdown list. Selecting the MRP code automatically populates the MRP Name.
  1. Choose the ‘From Date’ and ‘To Date’ for the period which MPS Run Process is applicable for.
  1. Tick the ‘Include Exception’
  1. Tick/untick the safety stock as required:
    1. Enabling safety stock includes the buffer stock in planning.
    2. Disabling safety stock excludes the buffer stock in planning.
  1. Tick/untick the ‘Pegging Required’ if needed. Enabling Pegging allows you to track your materials.
  1. Tick/untick the ‘Stock Post Required’ if needed. Enabling this facilitates the system to consider the pre-existing stock.
  1. Click ‘Process’ to run MRP Run Process.

Revisions

Translate »