MRP (Material Requirements Planning) is a system for calculating how much material and components a product will need. MRP consists of three steps:
- Taking stock of the materials and components,
- Assessing the need for additional ones,
- Following that, they must be scheduled for production or purchase.
Navigation Path: Planning>Transaction>MRP Run Process
- Follow the above steps to open the ‘MRP Run Process’ screen.
- Select the ‘Master schedule’ from the pick list.
- Select the ‘MRP Code’ from the dropdown list. Selecting the MRP code automatically populates the MRP Name.
- Choose the ‘From Date’ and ‘To Date’ for the period which MPS Run Process is applicable for.
- Tick the ‘Include Exception’
- Tick/untick the safety stock as required:
- Enabling safety stock includes the buffer stock in planning.
- Disabling safety stock excludes the buffer stock in planning.
- Tick/untick the ‘Pegging Required’ if needed. Enabling Pegging allows you to track your materials.
- Tick/untick the ‘Stock Post Required’ if needed. Enabling this facilitates the system to consider the pre-existing stock.
- Click ‘Process’ to run MRP Run Process.
Revisions
- December 12, 2022 @ 05:43:27 [Current Revision] by admin
- December 8, 2022 @ 10:31:18 by arul