Here are the points that are improved.Take a look!
Inventory
35501 – Material Movement Screen need enable Rejection Reason button
33173 – Option to edit MRP in Lot – There is a menu called Lot Creation under (inventory->transaction->Dyeing->Lot Creation)
Just enable update rights to that menu and check the update button near to mrp rate in L lightbox
Project
35361 – Task Screen – MS, Heading can be roll-up by default,Work to be NONE by default. cannot be rollup,Task can be Rolldown or none only (cannot be rollup)
Subcontract
35347 – Process Picklist changes Subcontract and Jobwork Module should be Routing Sequence
HRMS
35295 – In punch not taken in good books but available in ESS bio server
35303 – ess year – currently you have to “delete” the current pay period to show the available pay period instead “drop down option needed”
35288 – esi wages would includes earBasic,earDa,earHra,Ot wages + extra from april salary
|
|
|
|