Here are the points that are improved.Take a look!Admin
31327 – your support needed as unable to sync in baba pune and AUTOMARK at 7.15 pm today
31278 – Data handeling
31228 – Cost Analysis Screen also Required under Admin Module
31150 – Source Type changed lock should not be altered or deleted through sync
31108 – workflow approval need for EMP164 login
31106 – isvisible field in payperiod
30233 – Replicate City from sql to oarcle Gb4–>this is not working
27581 – 2 Service (api) would be written for Poabs
CRM
31345 – Role in Product tab consist the concrete value of role
31340 – Service rule/Wage rule reconcilation in Excel with mappings
31102 – CALL PLANING–>ASIGNEE SCREEN–>EXTEND THE TEXT LENGTH OF REFERENCENUMBER
28907 – Need Task type & Task ref no columns to appear in the CSV report of Task list tree view
28466 – Where & How to view closed tasks & works on a particular date & export a report ?
27422 – Same Bill Number with different dates – Call Center
Payroll
31374 – Unable to save permission (Input string was not in correct format error coming)
31371 – Getting error in sync and sending the timesheet from app
31362 – HRMS/Pay Process Report
31359 – HRMS/Paytax Type Calculation and Paytaxtype Detail Setting Report
31354 – Need to show text in timesheet crew Email notification for changes made in ERP Stage
31353 – Need to show all text which is enter in the reject
31334 – Double timesheet created for the same month (Stage)
31331 – Hitch date change for the crew who’s timesheet already approved (Stage)
31184 – Service attendance is not loading after query correction
31164 – ot and pi calculation wrong as new correction
31151 – Employee Separation Request in Ess
31044 – wage rule addendum file should be in PDF format
31018 – Update hitch requirement
30894 – Urgently Required for Rvl Service Attendance
30726 – Corrections in wage rule screen
30560 – worktype master for recruitment process
MM
31364 – Purchase and miscellaneous purchase reports based on Approved on
31336 – error while saving MM document (HAL Oman) ‘arthimetic over flow’
31245 – system allowed with wrong Period for a OU in settings
31225 – Lead loaded using MM Screen should not allow to save with leadid -1
31116 – Trigger needed when negative stock
31085 – GIN Number tracking – Option to enter details post Material Inward
31082 – Changes in HAL Oman – MIN wise tracking
SubContract
31307 – subcontract part qyt issue |